Instruction:
Thermal shock test chamber is used to test the extent of endurance of material structure or composite materials under extremely high or low temperature in an instant, so as to test the chemical changes or physical damage caused by thermal expansion and contraction in the shortest time. Applicable objects include metals, plastics, rubber, electronics and other materials, which can be used as the basis or reference for product improvement.
Model |
GROC2/C3 |
GROC2/C3 |
GROC2/C3 |
GROC2/C3 |
|
Interior Size WxHxD(cm) |
50×66×50 |
60×85×80 |
100×100×80 |
100×100×100 |
|
Temperature Range |
(150℃~A:-45℃;B:-55℃;C:-65℃); (High temperature zone :+60℃~+150℃; Low temperature zone: -10℃~-65℃) |
||||
Heating Time (Heat Storage Zone) |
RT~200℃ will take about 35min |
||||
Cooling Time (Cold Storage Zone) |
RT~-70℃ will take about 85min |
||||
Temperature recovery time / conversion time |
≤5min/≤10sec |
||||
Temperature Control Accuracy/Distribution Accuracy |
±0.5℃/±2.0℃ |
||||
Internal/external Materials |
The whole machine covered matt SUS 304# stainless steel plate, the inner chamber is stainless steel |
||||
Thermal Insulation Material |
High temperature resistant, high density ethyl chloroformate foam insulation material |
||||
System |
Microcomputer balance temperature control system |
||||
Cooling System |
Semi-closed two-stage compressor (water-cooled) / fully enclosed double-stage compressor (air-cooled) |
||||
Protection Devices |
Fuse-free switch, compressor high and low voltage protection switch, refrigerant high voltage protection switch, fault warning system, electronic alarm |
||||
Accessories |
Viewing window, 2 upper-lower-adjustable compartments, electrified wire hole, casters, horizontal bracket |
||||
Power Supply |
AC380V 50HZ/60HZ 3∮ |
||||
Weight (Approximately) |
700Kg |
900Kg |
1200Kg |
1400Kg |
1900Kg |
Controller |
South Korea “TEMI” or Japan “OYO” |
||||
Compressor |
France-made "Tecumseh" |